Plumbing fixtures, door furniture and final fit out – Day 232 – April 13, 2018

After many months the temporary fence has finally been removed, providing a clear view of the house. As an added bonus the onsite porta-loo has also been removed providing our first photo of the house facade without a dunny in front!

Progress onsite this week

  • Water-proofing of outdoor shower
  • Commenced install of plumbing fixtures
  • Installed door furniture
  • Install of shelving
  • Install of data cabling and cabinet
  • Sealed the concrete driveway
  • A bit more upstairs that we couldn’t see

Plan for the week ahead

  • Tiling for outdoor shower
  • Timber floor sanding and coating

 

Front facade without the fence and toilet.

The kitchen sink now has a tap.

A view of cabinetry installed in the entry from the garage. Not sure why it’s there – we didn’t ask for it!?

Recycled water taps installed.

Data cabinet installed in the garage. Ready for NBN fibre to the premises – yeah!

 

Pendant light in the stairwell. A wooden UFO?

 

Almost looks ready to move in.