Plaster downstairs – Day 108 – December 9, 2017

The house is almost at lock-up stage now.

  • Temporary doors have been hung and locks fitted
  • Plaster has been installed in most of the ground floor area.

I’m assuming they’ll continue with the plaster during the week.

The remaining windows have now been installed upstairs (still waiting on one to be replaced)

Plaster installed in the office