Some more solid progress since our last visit onsite

  • The timber flooring has all been installed on the ground floor. It’s now ready for sanding (at a later date)
  • The timber stairs have been installed

Kitchen install is planned for this week. The install of architraves and skirting will commence shortly after.

Doors ready for hanging.

Material ready onsite for fix out (skirting and architraves)

Timber floor in the kitchen area – island bench to conceal the power conduit shown in the photo.

 

Timber stairs have been installed.