Tag Archive: Carpet

Walkthrough Day – Day 260

The site supervisor had already carried out his own review and the painters and plasterers had performed a series of touch-ups in preparation for our walkthrough. Overall the review went well, the house looks great and we can’t wait to move in.

However, between us and the builder we identified further areas that require additional touch-ups. For the most part, nothing too serious, just a bit of additional gap filling, sanding and painting required. On the larger scale the WIR cabinets in the master bedroom didn’t match the dimensions on the plan so they’ll need to be replaced and the extreme weather over the past few days uncovered a leak in some of the flashing that introduced an unplanned water feature in Riley’s bedroom.

So, instead of a weeks worth of finishing it’ll probably be closer to 2 weeks. That includes the install of kitchen appliances and some of the electrical fittings. So close, but not yet.

Rather than share some photos of the almost finished house I thought I’d post some photos of our current temporary accommodation. It’s more beach shack that beach house but we know it’s a temporary stop-over before we move into our dream home.

Not long now…

Modern stove and oven

Walk in pantry

The laundry

The main bathroom with step in shower/bath combo

Water saving showerhead

Hardcore door handles

Creative electrical work

Feature light in the lounge with timber lined walls and ceiling

 

Paint Touch-ups, house cleaned, additional fittings – Day 250 – May 1, 2018

Another week  passes by and we inch closer to handover. As you’d expect, there’s lots of small changes, with no structural work going on. Our site supervisor has done his initial walkthrough and placed marking tape on the various elements that need filling, painting, cleaning, straightening and replacing. We’ve been given a tentative walkthrough date of May 8 (next Tuesday). Potential handover date – May 18/19.

Updates for the past week

  • Carpets installed
  • Outdoor shower installed
  • House cleaned
  • Additional plumbing fittings
  • Painting touch-ups

Work scheduled for this week

  • Plastering touch-ups
  • Painting touch-ups
  • Final clean

NBN fibre to the premises. Yeah!

Carpets in the office.

Polished floors, clean walls and shiny cupboards. Almost ready to move in.

All windows have been cleaned with dirty marks and manufacturer stickers removed.

Outdoor shower installed.