Site Cut – Day 1 – August 24, 2017

1 year, 11 months and 14 days (714 days) after we placed the sold sticker on our previous home we’ve finally started construction on our new home in Torquay.

Site cut was carried out on the block today in preparation for sewer connection and slab preparation.

It hasn’t changed the view much (it’s still an empty block) but it means a lot to see some activity that’s a part of the overall construction process.

The first of many photos from directly across the road

The block was already relatively level so not much earth-moving was required.